Change set

Pick exam & year, then Go.

Question map
Not attempted Correct Incorrect ★ Bookmarked
Loading…
Q71 (CAPF/2017) Geography › Indian Physical Geography › Indian river projects Answer Verified

Match List I with List II and select the correct answer using the code given below the Lists : List I List II (Hydro power (River) project) A. Maithon project 1. Chambal river B. Salal project 2. Bhagirathi river C. Rana Pratap 3. Barakar river Sagar project 4. Chenab river D. Tehri project Code : A B C D

Result
Your answer: —  Â·  Correct: D
Explanation

The correct matching of hydropower projects to their respective rivers is as follows: Maithon project is located on the Barakar river in Jharkhand, which is a major tributary of the Damodar river. The Salal hydroelectric project is constructed on the Chenab river in the Reasi district of Jammu and Kashmir. The Rana Pratap Sagar project is a multipurpose dam built across the Chambal river in the Chittorgarh district of Rajasthan. Finally, the Tehri project, known as the highest dam in India, is situated on the Bhagirathi river in Uttarakhand [1]. Therefore, the correct sequence for A-B-C-D is 3-4-1-2, which corresponds to Option 4. These projects are vital for irrigation, flood control, and power generation across their respective regions.

Sources

  1. [1] Environment and Ecology, Majid Hussain (Access publishing 3rd ed.) > Chapter 9: Distribution of World Natural Resources > 3. Regions with large Demand of electricity > p. 22
How others answered
Each bar shows the % of students who chose that option. Green bar = correct answer, blue outline = your choice.
Community Performance
Out of everyone who attempted this question.
48%
got it right
✓ Thank you! We'll review this.

SIMILAR QUESTIONS

5 Cross-Linked PYQs

UPSC repeats concepts across years. Login to see how this question connects to 5 others.

Login with Google